Friday, September 7, 2012

Affix Bar clamp sub-assembly and rear threaded rod to frame triangle


  1. Affix a M8 nut and a M8 washer to each side of the bar clamp rod of the Bar clamp sub-assembly

  2. Slide the rod into the upper holes of the open footed frame vertices

  3. Affix the Bar clamp sub-assembly  to the frame triangle with M8 washers and nuts on both rods

  4. Repeat steps 1-3 for the remaining frame triangle hole, using a 295 mm (1 dot) threaded rod